# Phase 06 — Plan 06-09 SUPERSEDED

**Status:** SUPERSEDED by Phase 06.7 (`1f6073e`, 2026-05-17)

**Original scope:** `verify-phase-6.mjs` composite gate + `06-HUMAN-UAT.md` milestone artifact (cross-cutting REQ-CLI-01..09 + REQ-AST-01).

**Why superseded:** The MVP-gate verification path the original plan envisioned (server-authoritative movement + reconciler verification) was structurally changed by Phase 06.7's client-trust network model shift. The composite gate as drafted would have asserted properties that no longer apply (server-side movement integrity, reconciler-snap tolerance bounds). CLI-08 — the hard milestone the gate existed to certify — was cleared end-to-end via the Phase 06.7 HUMAN-UAT round 2 PASS at `1f6073e` against the deployed staging environment.

**Verification evidence:** [`06.7-HUMAN-UAT.md`](../06.7-network-model-client-trust-fall-trigger/06.7-HUMAN-UAT.md) round 2 sign-off (operator dunsen, 2026-05-17). Two-player movement + chat + reconnect + fall-reset all PASS on `1f6073e`.

**Closed under:** v1.0 MVP milestone.
